Post-Construction Cleaning in Indianapolis, IN

Post-construction final cleans in Indianapolis run $0.20 to $0.55 per square foot, set by dust load, glass count and how much trim work is still going on. Most jobs are done in three passes: a rough clean once trash is out, a final clean after the punch list, and a touch-up right before your tenant or staff move in.

Signs you need this

  • Drywall dust is in every supply vent, track and door top
  • Adhesive, paint spots and label residue are stuck to new VCT
  • Manufacturer stickers are still on glazing and appliances
  • The general contractor's cleanup stopped at sweeping
  • Your certificate of occupancy walk is booked and the space is grey
  • Move-in is on a fixed date and the punch list is still open

What separates a rough clean from a final clean

A rough clean exists to make the space workable for the trades still in it. Debris out, gross dust down, window tracks and door frames cleared, floors swept and first-pass mopped. It saves money later because dust that gets removed early stops recirculating and settling on everything the finish trades install.

A final clean is measured in detail. Inside and outside of every cabinet and drawer, tops of door frames and partitions, light fixture lenses, vent and diffuser faces, switch plates, outlet covers, glass on both sides including frames and tracks, restroom fixtures polished, floors cleaned to whatever the flooring manufacturer specifies. This is the pass your tenant walks through, so it is the one that earns or loses the job.

Dust behaves badly

Drywall dust is fine, light and electrostatic. It settles into every horizontal surface, then lifts again the moment a door opens or the HVAC cycles. That is why the sequence runs top down and why a single pass never holds. High dusting first, then verticals, then horizontals, then floors, with HEPA vacuums doing the lifting rather than brooms pushing it around. A touch-up pass exists because the building will keep releasing dust for days after the final.

Glass, adhesive and the details people argue about

Manufacturer labels on glazing, appliances and fixtures, adhesive residue from protective film, paint overspray on hardware, joint compound splatter on frames, grout haze on new tile. Each needs its own approach and some need a blade used carefully on the right kind of glass. Low-e coated and tempered glass get different handling. Getting this wrong is expensive, so it is done by someone who has done it before.

Working in occupied Indianapolis buildings

Suite level fit-outs in Mile Square towers and around Keystone at the Crossing come with building rules that shape the whole job: freight elevator windows, floor protection in common corridors, dust barrier requirements, after hours access and dock scheduling. Distribution and light industrial build-outs along Ronald Reagan Parkway in Plainfield are the opposite problem, with a large open slab, a lot of square footage and very little detail work. The price per square foot reflects that difference.

Scheduling around a date you cannot move

Move-in dates and certificate of occupancy walks are fixed and everything else slides toward them. We take the target date at the start, hold the crew, and confirm the actual schedule a few days out when the punch list tells the truth. If the schedule collapses, we split the space into phases and clean the areas that are genuinely finished rather than waiting for the whole floor.

How the work runs

  1. 1

    Rough clean

    After trash and debris are removed and before finish trades wrap up. Gross debris out, high dusting, first pass on floors, window tracks and sills cleared so the next trades work in a clean space.

  2. 2

    Final clean

    The detail pass. All surfaces, inside and outside of cabinetry, light fixtures, vents and diffusers, glass both sides, fixtures polished, floors cleaned to their finish requirement.

  3. 3

    Touch-up clean

    Scheduled 24 to 48 hours before move-in or a certificate of occupancy walk. Catches the dust that settles after the final, plus anything the punch list crew disturbed.

  4. 4

    Handover walk

    We walk the space with your project manager or tenant representative and correct anything flagged before the crew leaves the building.

What it typically costs

Job Typical range
Final clean, office fit-out Depends on dust load, glass count and remaining trim work $0.20 to $0.55 per sq ft
Rough clean Before finish trades complete, debris and gross dust $0.10 to $0.25 per sq ft
Touch-up clean Final pass 24 to 48 hours before move-in $0.05 to $0.12 per sq ft
Window and glazing cleaning Interior and reachable exterior, includes sticker and adhesive removal $4 to $12 per pane
New VCT initial seal and finish Five coats on new tile before occupancy $0.35 to $0.70 per sq ft
Warehouse or shell space Large open areas with fewer detail surfaces $0.08 to $0.20 per sq ft

Typical ranges for Indianapolis and the surrounding area , reviewed September 2026. Every quote is written and fixed before work starts.

Post-construction questions

When should we book the final clean?

Once the punch list is closed or nearly closed, and after any remaining trim, paint or flooring work. Booking the final before trades are finished means paying twice. Give us the target date at the start of the project and we hold the crew, then confirm three or four days out when you know where the schedule really is.

Do you handle construction debris?

Light debris, packaging, offcuts and general trash yes, bagged and taken to your dumpster on site. Bulk debris removal, dumpster hire and anything classed as construction waste stays with the general contractor. If the dumpster has already been pulled, tell us before the crew arrives so haul-away is priced into the job.

How do you get drywall dust out of the HVAC?

We clean accessible supply and return diffusers, grilles and the surfaces around them, and we HEPA vacuum everything that settles. Cleaning inside the ductwork itself is a different trade with different equipment, and if the system ran during construction you should get a duct cleaning contractor in before occupancy.

Can you clean new floors before they are sealed?

Yes, and the order matters. New VCT needs its manufacturing residue removed before finish goes down, usually with a light scrub and neutral rinse, then four or five coats. Sealed concrete, LVT and carpet each have their own first clean. Tell us the flooring spec and we follow the manufacturer's instruction rather than a generic process.

Do you work nights and weekends on construction jobs?

Regularly. Fit-outs in occupied downtown buildings almost always mean after hours work because of elevator and freight dock restrictions. Send us the building rules with the walkthrough: freight elevator hours, protection requirements, noise windows and badge access all affect the crew size and the price.

What if the tenant finds problems after the touch-up?

Anything on the handover walk is corrected before the crew leaves. Anything found in the first few days after occupancy gets a return visit at no charge, as long as it is construction related rather than new soil from moving in. That boundary is written into the quote so nobody has the argument later.

Call now Get a quote